I started to 'really' do my 3D 9 days ago.
this is from ages ago.
1st day...walls up
2nd day - starting on residential area
3rd day - spend the whole day drawing the useless cafe facade. which nobody can see -___-
4th day - draw balcony ( yes i know i'm slow )
so on the 5th day raised up the residential walls and even manage to have my lift core and staircase all finished. ( actually is like copy and paste -__- )
6th day - almost done with residential area. added in the doors.
7th day - the roof garden + creative zone and courtyard + front entrance finished
looking at the effect from the front entrance...e..why my vases all terapung 1 ? -__- now baru realise. haih.
8th day - 2 roof up ( actually is one only i copy and paste =p ) plus the front maze ( dono what to put in front so use back my 1st year idea =p )
the perspective...
another...hmm...dono why i love willow trees a lot...like got feel...
the 9th day - add the last part of roof and then landscape and then finished !
The last part of the L-shaped roof is which i hide and lost it. ( next time better don't hide ur money later lost like the roof )
Bird eye view.
That night i exported all the images out.
Then this morning ( okay, yesterday morning if u prefer ) i started to do the presentation board.
Dr K say submit whatever we have and the final sub will be with the technical drawing which will be weeks after =)
So i didn't do it in great detail. I mean, the board is so simple like the one during my Ar Hong nightmare time 2 sem ago.
I only came out with 5 boards.
The so-called conceptual sheet. my concept is fun learning
I dono i'll be bom by the lecturers or not later during presentation which is like 7 hours later.
I combined my concept sheet with perspective.
aih, whatever la...
The gigantic site plan.
The site plan and the one below is in A0 size. Which is 594mm x 1189mm.
That is huge.
Like when i first enter first year and see A2 size paper.
Now i had problem differentiate A4 and A3 paper.
Both look so small and sama to me.
-__-
The floor plan
read urself la

Im so damn unlucky till today.
I went to 3 printing shops around 7pm sth and damn it, every shop close ady.
shud be 8pm at least baru close but dono why today so 'spacial' like they noe i want to come so fast fast close gate.
haih.
So luckily ( is this lucky ? ) i can still go and print using the senior's A3 printer.
The quality not bad la...
And i paid Rm21 for 28 A3 only. heheh. ( i combine 4 A3 to make into 1 A1 )
cut and paste cut and paste
so big.
stick the A3 stick till wan2 die
so Mr Giraffe come help me
That's all. Hopefully the presentation 2mro will go smoothly.
Good Night. =)
It's a thunder-ly night.
this is from ages ago.
1st day...walls up
2nd day - starting on residential area
3rd day - spend the whole day drawing the useless cafe facade. which nobody can see -___-
4th day - draw balcony ( yes i know i'm slow )
so on the 5th day raised up the residential walls and even manage to have my lift core and staircase all finished. ( actually is like copy and paste -__- )
6th day - almost done with residential area. added in the doors.
7th day - the roof garden + creative zone and courtyard + front entrance finished
looking at the effect from the front entrance...e..why my vases all terapung 1 ? -__- now baru realise. haih.
8th day - 2 roof up ( actually is one only i copy and paste =p ) plus the front maze ( dono what to put in front so use back my 1st year idea =p )
the perspective...
another...hmm...dono why i love willow trees a lot...like got feel...
the 9th day - add the last part of roof and then landscape and then finished !The last part of the L-shaped roof is which i hide and lost it. ( next time better don't hide ur money later lost like the roof )
Bird eye view.That night i exported all the images out.
Then this morning ( okay, yesterday morning if u prefer ) i started to do the presentation board.
Dr K say submit whatever we have and the final sub will be with the technical drawing which will be weeks after =)
So i didn't do it in great detail. I mean, the board is so simple like the one during my Ar Hong nightmare time 2 sem ago.
I only came out with 5 boards.
The so-called conceptual sheet. my concept is fun learningI dono i'll be bom by the lecturers or not later during presentation which is like 7 hours later.
I combined my concept sheet with perspective.
aih, whatever la...
The gigantic site plan. The site plan and the one below is in A0 size. Which is 594mm x 1189mm.
That is huge.
Like when i first enter first year and see A2 size paper.
Now i had problem differentiate A4 and A3 paper.
Both look so small and sama to me.
-__-
The floor plan
read urself la
Im so damn unlucky till today.
I went to 3 printing shops around 7pm sth and damn it, every shop close ady.
shud be 8pm at least baru close but dono why today so 'spacial' like they noe i want to come so fast fast close gate.
haih.
So luckily ( is this lucky ? ) i can still go and print using the senior's A3 printer.
The quality not bad la...
And i paid Rm21 for 28 A3 only. heheh. ( i combine 4 A3 to make into 1 A1 )
That's all. Hopefully the presentation 2mro will go smoothly.
Good Night. =)
It's a thunder-ly night.




0 Comment:
Post a Comment